Generic filters
Exact matches only
FS Logoi

Metalloinvest orders a new electric arc furnace and a ladle furnace from Danieli

Kategorien: |
Autor: Redaktion

Datum: 06. Mai. 2021

06.05.2021. Russian Metalloinvest has selected Danieli to supply a new electric arc furnace (EAF #5) and a new ladle furnace (LF #4) to be installed at the Alexey Ugarov OEMK plant in Stary Oskol, in southwest Russia, to produce quality steel grades, including SBQ (special bar quality) steel for the automotive and bearing industries.

EAF #5 will operate with up to 100 % DRI in the burden, delivering 1.2 Mt/a of liquid steel to be refined in the new ladle furnace. The practice of liquid steel hot heel will improve the quality of steel as well reduce the specific energy and furnace electrode consumption.

Nazim Efendiev, CEO of Management Company Metalloinvest, commented: “Today we have made another important step in implementing Metalloinvest’s Qualitative Change Strategy. A more productive and economical furnace and the new integrated steel processing unit will help to reduce production costs.”

Technological packages

Technically, the new furnace will feature a wide set of Danieli technological packages, such as Thor 3K automatic door, Q-Sand charging system, robotic sampling manipulator and advanced Danieli Automation controls for increased productivity. The order also includes a new EAF primary dedusting line with a quenching tower, and an EAF charging crane as well.

EAF #5 is scheduled to be commissioned in 2023 and LF #4 in 2024.

 

(Source: Danieli)